
CDX DPA Field Development
Samedan
Bohai Bay, Offshore China
Scope of Work –
Detailed Design and Installation Supervision of the Floatover Topsides
Three-Level Floatover Topsides Weight – 4,000 Short Tons
Jacket Weight – 400 Short Tons
Completion Date – 2004