Sanha LPG Fractionation FPSO Project
JGC
Chevron
Offshore Angola
Scope of Work –
Structural Support Module Design
Design Rates –
Process 37,000 BBLS of LPG per day into Propane and Butane Products
Double-hulled to Store 135,000 Cubic Meters of Propane and Butane
Side-by-side and Tandem Offloading
New Build Tanker
Turret Moored
Water Depth – 200 ft
Completion Date – 2003
Records (at time of installation) –
World’s First LPG FPSO