
Jubilee FPSO Development
MODEC
Offshore Ghana
Scope of Work –
Detailed Design of Topsides
Design Rates –
160 MMscfd
120,000 BOPD
84,000 BWPD
232,000 BPD Water Flood
1.6 Million BBLS Storage
Conversion Tanker
Spread Moored
Water Depth – 5,000 ft
Completion Date – 2009