
Agbami FPSO Project
HHI
Chevron
Offshore Nigeria
Scope of Work –
EPC FEED Verification – 5 Months Duration
Design Rates –
450 MMscfd
250,000 BOPD with 8 RVP
250,000 BWPD
450,000 BPD Water Flood
450,000 BFPD
415 MMscfd Injected Gas to 7,000 psig
50 MMscfd Gas Lift
200,000+ HP of Compression and Generation
Power Generation – 70 MW
2.3 Million BBLS Storage
New Build Tanker
Spread Moored
ABS Classed
EPC Contractor - HHI
Water Depth – 5,000 ft
Completion Date – 2004
Records (at time of installation) –
World’s Largest FPSO