Hunter Mesa

Minimize

encana hunter mesa photo, alliance engineering

Hunter Mesa Station Expansion
Encana / Enterprise Products


Scope of Work:

Alliance Engineering provided detailed engineering, design, project management, procurement and construction support to add 2 new compressor units, process and utility coolers, dehydration equipment, MCC, and piping and electrical to the station to accommodate the increased capacity.

Project Description:
Hunter Mesa was an existing station with four CAT3612/Ariel JGZ/6 reciprocating compressor units. This project involved expanding the existing natural gas compressor station from 100 MMscfd to 150 MMscfd.

Equipment:

  • 1 CAT3616/Ariel KBZ/4 reciprocating compressor skid
  • 1 CAT3612/Ariel KBZ/4 reciprocating compressor skid
  • 2 Process gas coolers
  • 2 Utility water coolers
  • A 175 MMscfd dehy unit with filter coalescer, contactor tower, discharge separator, glycol regen skid, and still overhead condenser heat exchanger
  • Pre-engineered steel compressor building
  • MCC Building and power distribution
  • Fuel gas heater and regulator skid

More information about the installation of the additional compressor units can be found on the Hunter Mesa page in the "Compressor Stations" section of this website.

Hunter Mesa was completed in July 2011.

hunter mesa model shot, alliance wood group engineering  encana hunter mesa photograph, alliance engineering processing and production facilities

alternate photo, alliance engineering, hunter mesa processing and production facility