Project Description – This project involves the installation of a grassroots compressor station, including facilities. The full build-out of facility will be 700 MMscfd compressing from 650 psig to 1850 psig. Two 3616 CAT / JGZ 6 compressor packages will be installed during the first phase of the project.  Facilities include Cat-Ariel G-3616/JGZ-6 compressor units with coolers, slug catcher, filter-coalescers, ultrasonic discharge metering, and auxiliaries.  Facilities also include the interface to adjacent Anderson Gulch facility via piping tie-ins

Scope of Work – Alliance provided project management, engineering, and design for a greenfield compressor station consisting of 2 natural gas driven reciprocating compressor units and associated facilities. The station is designed to accommodate expansion for up to 3 additional compressor units.


Copyright © 2010 by Alliance Wood Group Engineering, L.P.   |   Privacy Statement  |   Terms Of Use
Reg. No. F-3176
A Wood Group Company