Golden Triangle Gas Storage
Confidential Client Gas Storage Cavern
Scope of Work: Engineering, design, surveying, FERC 7C permitting support, construction and project management services.
Alliance engineering provided engineering, design, surveying, FERC 7C permitting support, construction and project management services for this gas storage cavern. The major equipment installed includes 9 miles of side by side 24” header pipelines, feeding laterals to five interconnect meter sites, 3.5 miles of 16” raw water supply pipeline, 3 miles of 16” brine disposal pipeline, 1 mile of 20” compressed gas pipeline to the gas cavern delivery pipeline and 1 mile of 12” return pipeline from the gas cavern to the compressor station.