Scope of Work:
Alliance provided design reviews, project coordination, owner representation and construction inspection.

Project Description:
Installation of a grassroots 700 MMscfd interconnect facility for Marcellus gas between Range Resources and Williams – Transco.

Equipment:

  • Interconnections with three existing pipelines
  • Ultrasonic Measurement
  • Flow Control
  • Overpressure Protection
  • Cathodic Protection System
  • Purchase Power
  • SCADA and Controls Systems
  • Odorization System
  • Gas Chromatograph
  • Moisture Analyzer
  • Measurement, Flow Control, Odorization and Electrical Buildings