Douglas Compressor Station
El Paso
Project Description – This project involves the installation of an additional compressor unit in parallel with the three existing units as well as auxiliary systems to support the unit. The three existing compressor units are restaged and their gas coolers modified for discharge gas cooling. The new systems include: gas compression, building shutdown system, fuel gas system, vent system, compressed air system, synthetic and mineral lube oil supply and storage system, unit suction and discharge piping system. Existing systems requiring expansion include: electrical system, instrumentation / automation system, waste liquid and drain system, main gas piping system. Installed equipment includes one GE PGT-20 centrifugal compressor unit with all associated piping, building and ancillary equipment.
Scope of Work – Alliance provided project management, engineering and design.