Brazos Station
Troy Construction
Scope of Work: Project management, engineering, detailed design, equipment and materials procurement, inspection and construction
Equipment:
- Three Cooper RAM-52 two-throw single-stage compressors with 900 HP EMD with VFD control
- Process gas cooler
- PCL-based station control system
- Discharge filter coalescer
- MCC building with 4-160V Main Breaker
- 3 VFD drives
- 480V MCC and UPS/battery system
- 2 24” launcher/receivers
- 2 ultrasonic meters (one 12” and one 4”)
- Meter/PLC building
- Gas chromatograph and moisture analyzer
This project included the engineering, design, drafting, material and equipment procurement, construction, commissioning and start-up services for a fuel gas compression station and gas yard pressure regulation, metering and filtration facility located in North Texas.
The scope of work included necessary engineering, design, drafting, material procurement, and construction services for the installation of three (3) Cooper RAM 52, two-throw, single stage, reciprocating compressors each driven by 900 HP induction motors, complete with the required facility ancillary equipment, and an associated 250 feet of 12” pipeline interconnect to interstate pipeline custody transfer meter site, terminating at the suction of the compressor station.
In addition, gas yard pressure regulation, metering, and gas filtration equipment – located at the power plant and containing 12” and 4” ultrasonic meters, meter PLC, gas chromatograph, moisture analyzer and walk-in enclosure and dual vertical filter coalescers – were installed.
This project was completed in June 2010.