

Shenzi TLP
BHP
GoM – Green Canyon Block 653
Scope of Work –
Conceptual, FEED, Detailed Engineering and Design, Procurement, and Fabrication Support
Design Rates –
50 MMscfd
100,000 BOPD
125,000 BPD Future Water Injection with Sulphate Removal
Water Depth – 4,373 ft
Lift Weight – 8,350 Short Tons
Subsea Host to Production from 3 Drill Centers
Single Module Topsides
Completion Date – 2008
Records (at time of installation) –
Largest Oil Capacity Single Lift Topsides
World’s Largest MOSES TLP